CO129-115 - Sir MacDonnell - 1866 [9-10] — Page 179

CO129 Colonial Office Hong Kong Records 理藩院香港檔案 All AI Reviewed

The angle of the hills rising on all sides from the natural side is steep, being in some places 50° and at others nearly perpendicular.

It will be seen that the height of the Bank has been fixed at 50 feet in consequence of the nature of the ground where it is proposed to construct the Bye Wash. A Bye Wash could not have been formed at a greater height without cutting into the side of the hill.

Edations to Valor Mill so Cubie ft. - 20° very heavy labre Pell 5'2 5'. 20 ft.

**

178

72b41 80

6.000

640

pc $15.

300

ponry in Malls of Bye

2400

The proposed Embankment will be laid on a Bed of Concrete and will be formed of Material excavated from the inside of the Reservoir, carried by Coolies in Baskets and rammed in 12 in: pouts Paving to bed Layers. The puddle Wall will be formed of Canton River Muds, an excellent Material for the purpose, it will be protected by 2000 Cubic ft. of decomposed Granite and stone also rammed in Layers. The seaside slope, Syphon, and top of the Embankment will be faced with Granite in 12" courses laid in Cement and pointed with salt.

Sestra Delivery Stand's

Quy

A Valve Well will be constructed on solid Ground on the South East side of the Embankment and 25 feet above the Beds of Sumping, leading off the Reservoir, within this Well Sluice Valves will be placed to draw off the Water at different Levels, a Culvert 5 × 3 will communicate between the Valve Well and the Gauge Basin and in this Culvert 10 Pipes will be laid to draw off by a Syphon arrangement.

1000

1000

9.800

4000

Conveyor Gen! & Ass Surveyor

ent the lower 25 feet of Water from the Reservoir

I believe between Next 4 Pottefulum -

500

2000

#96.281|80

Edit History

2026-05-19 11:38:18 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
The angle of the hills rising on all sides from the natural side is steep, being in some places 50° and at others nearly perpendicular. It will be seen that the height of the Bank has been fixed at 50 feet in consequence of the nature of the ground where it is proposed to construct the Bye Wash. A Bye Wash could not have been formed at a greater height without cutting into the side of the hill. Edations to Valor Mill so Cubie ft. - 20° very heavy labre Pell 5'2 5'. 20 ft. ** 178 72b41 80 6.000 640 pc $15. 300 ponry in Malls of Bye 2400 The proposed Embankment will be laid on a Bed of Concrete and will be formed of Material excavated from the inside of the Reservoir, carried by Coolies in Baskets and rammed in 12 in: pouts Paving to bed Layers. The puddle Wall will be formed of Canton River Muds, an excellent Material for the purpose, it will be protected by 2000 Cubic ft. of decomposed Granite and stone also rammed in Layers. The seaside slope, Syphon, and top of the Embankment will be faced with Granite in 12" courses laid in Cement and pointed with salt. Sestra Delivery Stand's Quy A Valve Well will be constructed on solid Ground on the South East side of the Embankment and 25 feet above the Beds of Sumping, leading off the Reservoir, within this Well Sluice Valves will be placed to draw off the Water at different Levels, a Culvert 5 × 3 will communicate between the Valve Well and the Gauge Basin and in this Culvert 10 Pipes will be laid to draw off by a Syphon arrangement. 1000 1000 9.800 4000 Conveyor Gen! & Ass Surveyor ent the lower 25 feet of Water from the Reservoir I believe between Next 4 Pottefulum - 500 2000 #96.281|80
Baseline (Original)
angle of 1.Forwad the hills rising on all sides from the Natur side at an in some places 50. and at others being nearly perpendicular. od under Bye Wash It will be seen that the height of the Bunk has been fixed of. 4ooft run 2 / 18- at 50 feet in consequence of the native of the ground where it is proposed to construct the Bye Wash. A Bye Wash could not have been formed at a greater height without in cutting into the side of the hill. edations to Valor Mill so Cubie ft. - 20° very heavy labre Pell 5'2 5'. 20 ft. ** 178 72b41 80 6.000 640 pc $15. 300 ponry in Malls of Bye 2400 The proposed Embantiment will be laid on a Bed of Concrete and will be formed of Material tation from the inside of the 4800 Cft: 50°__ Reservoir, carried by Coolies in Baskets and pammed in 12 in: pouts Paving to bed Layers. The puddle Wall will be formed of Canton River Muds- hervoir where te quiet a most excellent Material for the purpose, it will be protected by 2000 Cubia ft. c. 72- decompoved. Granite and home also rammed in Layers. The sepside sw Values, Syphon, and top of the Embantiment will be faced with Granite in 12° di Sipes, Stip Colts to.... courses laid in Cement and pointed with ail Saitty. Sestra Aelivery Stand's Quy A Volve Well will be constructed. Solid Ground on the $100. South East side of the Embantement and 25 fut above the Beds of Sumping, leading off of the Reservoir, within this Well Sluice Valves will be placed to in during foundation draw off the Meder at different Levels, a Culvert 5 × 3 with Corrm 4 X a Embantiments &c. unicate between the valve Well and the Gange Basin and pulling expences of in this Culvert 10 Pipes will be laid to draw off by a Syphon arrangement 1000 1000 9.800 4000 veyor Gen! & Ass Surveyor ent the lower 25 feet of Mates from the Reservoir I beliveen Vext 4 Pottefulum - 500 The 2000 #96.281|80
2026-05-19 11:38:18 · Baseline
View content

• angle of

1.Forwad

the hills rising

on all sides from the Natur side at an in some places 50. and at others being nearly perpendicular. od under Bye Wash It will be seen that the height of the Bunk has been fixed of. 4ooft run 2 / 18- at 50 feet in consequence of the native of the ground where it is proposed to construct the Bye Wash. A Bye Wash could not have been formed at a greater height without in cutting into the side of the hill.

edations to Valor Mill so Cubie ft. - 20° very heavy labre Pell 5'2 5'. 20 ft.

**

178

72b41 80

6.000

640

pc $15.

300

ponry in Malls of Bye

2400

The proposed Embantiment will be laid on a Bed of Concrete and will be formed of Material tation from the inside of the 4800 Cft: 50°__ Reservoir, carried by Coolies in Baskets and pammed in 12 in: pouts Paving to bed Layers. The puddle Wall will be formed of Canton River Muds-

hervoir where te quiet a most excellent Material for the purpose, it will be protected by 2000 Cubia ft. c. 72- decompoved. Granite and home also rammed in Layers. The sepside sw Values, Syphon, and top of the Embantiment will be faced with Granite in 12° di Sipes, Stip Colts to.... courses laid in Cement and pointed with ail Saitty.

Sestra Aelivery Stand's

Quy

A Volve Well will be constructed. Solid Ground on the $100. South East side of the Embantement and 25 fut above the Beds of Sumping, leading off of the Reservoir, within this Well Sluice Valves will be placed to in during foundation draw off the Meder at different Levels, a Culvert 5 × 3 with

Corrm

4

X

a

Embantiments &c.

unicate between the valve Well and the Gange Basin and pulling expences of in this Culvert 10 Pipes will be laid to draw off by a Syphon arrangement

1000

1000

9.800

4000

veyor Gen! & Ass Surveyor

ent the lower 25 feet of Mates from the Reservoir

I beliveen Vext 4 Pottefulum -

500

The

2000

#96.281|80

Comments

Approved members can add comments, bookmarks, and private notes.

No comments yet.

Private Research Note